Loose insulation panels in a roof space

What an issued Level 2 report in Coventry recorded, with the inspection photograph and the original advice.

EXAMPLE / 02 ROOF SPACE

Fallen polystyrene tiles in a roof space

The report recommended removing the loose tiles and checking roof-space ventilation and wiring.

Loose white polystyrene panels lying on mineral wool insulation in a roof space.Enlarge photograph
THE ORIGINAL PHOTOGRAPH

Fallen polystyrene tiles on the insulation at ceiling level.

ANONYMISED REPORT SUMMARY
Level 2 / 6a · Roof structure

2
01What was observed
Polystyrene tiles had been fitted between the rafters beneath a breathable membrane. Many had fallen onto the loose-fill mineral wool at ceiling level. No condensation or staining was noted in the roof space.
02What the report concluded
With insulation already at ceiling level, the report explained that the rafter tiles added little and loose tiles could obstruct ventilation at the eaves. It also identified the material's combustibility and the potential for contact with PVC cable sheathing to damage it over time.
03What remained uncertain
The reported EPC insulation depth was not measured during the inspection. The report did not record an electrical test or confirm damaged cable sheathing; roof-space ventilation still needed to be checked.
04What was recommended
A roofing contractor was to remove the fallen and remaining polystyrene tiles, rather than refix them, and confirm adequate ventilation. The electrician carrying out the Electrical Installation Condition Report was to check the roof-space wiring.
Why this element was rated 2

The roof structure element was rated 2. Removal of the polystyrene tiles and checks of ventilation and wiring were recommended.

Checked against the issued Level 2 report from Coventry: 6a · Roof structure; pages 29–30; photograph 34. Reviewed 22 November 2026. Wording is an anonymised summary, rather than a reproduction of the report.

Questions for a follow-up call

  • Which insulation did the surveyor recommend removing, and which material was intended to stay?
  • Who will confirm the ventilation arrangements and who will check wiring in the roof space?

Use the findings and timeframes in your own report when discussing a different home.

Organise the answers in your report action planner