Inspect the report
before buying it.
Fourteen elements from a full Level 2 specimen written in the report format of Mills Building Consultancy, a practice on our network. Each selected element includes its complete observation and recommendation, with references and page links matching the PDF. 12 Example Terrace is fictional: no inspection took place. Site photographs are shown as placeholders. Each practice issues its own report. An anonymised worked example from a separate issued Level 3 report appears below.
Price a report like this Download the full specimen (PDF) See every element a Level 2 coversJump to the actual Level 3 worked example
Open the report
A page of findings.
A clearer next move.
A useful report joins up what the surveyor could inspect, what they found and what you should do with that information.
Explore four parts of this page from the fictional Level 2 specimen. It shows how to read the advice, rather than treating a condition rating as the whole answer.
- 01Read the inspection limits.
- 02Understand the finding and its priority.
- 03Clarify the action before you commit.
Explore a page of the report
What could actually be seen?
The specimen records a ground-level inspection, with accessible upper windows and binoculars where helpful. It also says the roof was not walked. Read the limits alongside the findings; unseen areas remain uncertain.

MBC-2026-SPEC / PAGE 14 / FICTIONAL PROPERTY
An illustrative report; no inspection took place.
THE DOCUMENT / LEVEL 2
Open the report.
Follow the evidence.

Fictional property. No inspection took place. Each independent practice issues its own report.
THE FINDING / THE REASON / THE NEXT STEP
Read it
in context.
Open any element. The observation and recommendation belong together. These are complete selected element texts from the specimen, rather than a summary of the whole report.
5AChimney stacks
OBSERVATION + EXPLANATION
There is a single shared chimney stack at the ridge on each party line, both of coursed stone. The pointing to the left-hand stack is eroded to a depth of 15 to 20mm over much of its exposed height, and the cement flaunching around the pots is cracked and has lifted away from the pots on the weather side. The lead soakers and flashings at the stack base are visibly lifted along the front edge. Eroded pointing and failed flaunching allow water directly into the stack, which then travels down the flue and emerges internally. The damp staining we noted to the chimney breast in the rear first-floor bedroom (6c) is consistent with this, though we could not establish the path with certainty from a visual inspection.
THE RECOMMENDATION
We recommend that a roofing contractor repoints both stacks in full, renews the flaunching, and re-dresses the flashings at the stack base. This should be done before you commit to the purchase, so that the cost and the extent of the work are known to you.
Read 5A in the PDF5BRoof coverings
OBSERVATION + EXPLANATION
The main roof is covered in natural slate on timber battens, believed original to the property. Four slates have slipped on the rear slope and two are missing at the eaves course to the front. The ridge tiles are bedded in cement mortar which has cracked and is missing in two places. Slate of this age most commonly fails not in itself but at its fixings, the nails corroding until individual slates release; the scattered pattern of slippage here is consistent with that rather than with storm damage. The covering is not at the end of its life, but progressive slippage should be expected.
THE RECOMMENDATION
We recommend that a roofing contractor replaces the slipped and missing slates and re-beds the ridge, and that you budget for periodic slate replacement rather than treating each one as an isolated event.
Read 5B in the PDF5CRainwater pipes and gutters
OBSERVATION + EXPLANATION
The rainwater goods are a mixture of original cast iron to the front and uPVC to the rear. The cast-iron gutter to the front is leaking at the joint above the bay window, and the wall below carries a vertical band of staining and organic growth. The rear uPVC downpipe discharges onto the ground rather than into a gully. Persistent local saturation of a solid stone wall is a common cause of internal dampness at the corresponding position inside, and the staining below this joint indicates it has been leaking for some time.
THE RECOMMENDATION
We recommend that a roofing or general building contractor overhauls the cast-iron gutter and reseals the failed joint, and that the rear downpipe is connected to a gully. Both should be dealt with alongside the chimney and roof work.
Read 5C in the PDF5DMain walls
OBSERVATION + EXPLANATION
The main walls are of solid construction: coursed squared gritstone to the front and common brickwork to the rear, without a cavity. A slate damp-proof course is visible to the front elevation at approximately two courses above external ground level. To the rear, a paved patio has been laid at a level that brings it to, or above, the damp-proof course over much of its length. Where external ground level rises to or above the DPC, water bypasses it and enters the wall above, and in a solid wall it then shows internally. We noted elevated moisture readings at the base of the rear ground-floor wall consistent with this. There is no cracking of structural significance to either elevation. The mortar to the front elevation is eroded in places but the wall is sound.
THE RECOMMENDATION
We recommend that a general building contractor reduces the patio level to give a minimum clearance of 150mm below the damp-proof course, or forms a drained channel against the wall. This should be done before internal redecoration, not after.
Read 5D in the PDF5EWindows
OBSERVATION + EXPLANATION
The front elevation retains painted timber vertical sliding sash windows at both floors. The rear elevation and the extension have uPVC double-glazed casements, believed to date from the extension works. We opened one window on each floor. The paint finish to the front sashes is breaking down on the lower rails and the sills, with bare timber exposed at the outer face of the ground-floor bay. Painted timber deteriorates beneath an intact-looking coating and the visible loss is not a reliable guide to the extent, so the condition of the timber behind the paint could not be established from a visual inspection. We did not see kitemarks or etched safety marks on the low-level glazing to the rear.
THE RECOMMENDATION
We recommend that a joiner examines the front sashes, repairs or splices any decayed timber and redecorates fully. Where safety marks are absent, a glazier should confirm whether the glass in critical locations meets current requirements.
Read 5E in the PDF5FOutside doors (including patio doors)
OBSERVATION + EXPLANATION
The front door is a painted timber panelled door and the rear door a uPVC glazed door to the extension. Both operated satisfactorily and were in a condition consistent with their age and type.
6ARoof structure
OBSERVATION + EXPLANATION
The roof space was inspected from the access hatch on the first-floor landing. The structure is a traditional cut roof of rafters and purlins, with the purlins bearing on the party walls. The timbers are of a scantling consistent with the age of the property and no deflection of structural significance was apparent. There is no sarking felt beneath the slates, which is normal for a roof of this age and not a defect in itself, but it means that any slipped slate admits water directly. Insulation is laid between the ceiling joists to a depth of approximately 100mm, which is well below current standards. Staining was noted to the rafters adjacent to the left-hand chimney stack, consistent with the defects described at 5a. The timber was dry and firm to probing at the time of inspection.
THE RECOMMENDATION
We recommend that the insulation is topped up to at least 270mm by an insulation contractor, taking care not to block the eaves ventilation, and that the stained timbers are re-examined once the stack has been repaired.
Read 6A in the PDF6DFloors
OBSERVATION + EXPLANATION
The ground floor is of suspended timber construction to the front rooms, with a solid floor to the rear extension. The first floor is of suspended timber throughout. Fitted floor coverings were down and were not lifted. We noted two air bricks to the front elevation which are obstructed, one by a raised planting bed and one by mortar. Sub-floor ventilation is what keeps the void dry and the joist ends sound; where it is obstructed and external ground level also bridges the damp-proof course, as it does here, the combination leads reliably to elevated moisture in the void and to decay at the joist bearings. The sub-floor void was not accessible and we were unable to inspect the joists, the wall plates or the bearings. We cannot therefore confirm whether decay has begun, and the rating above reflects the significance of the possibility rather than a defect we observed.
THE RECOMMENDATION
We recommend that a timber and damp specialist lifts a floorboard in each affected room and inspects the sub-floor void before you commit to the purchase, and that the obstructed air bricks are cleared and the planting bed reduced by a general building contractor.
Read 6D in the PDF6EFireplaces, chimney breast and flues
OBSERVATION + EXPLANATION
There are original cast-iron fireplaces in both ground-floor rooms and in two bedrooms. The ground-floor front fireplace has an open grate which the vendor advised us is used occasionally. The remaining openings have been closed with boarding. We saw no evidence that the flue serving the open fire has been swept or tested, and no documentation was made available. Where a chimney breast has been closed off, the condition behind the boarding and whether the flue remains open, swept and ventilated cannot be confirmed from a visual inspection; a flue that is sealed without ventilation traps moisture within the stack.
THE RECOMMENDATION
We recommend that a HETAS registered contractor sweeps and tests the open flue and confirms that adequate ventilation exists before it is used, and that the closed flues are confirmed as ventilated at both ends.
Read 6E in the PDF6HBathroom fittings
OBSERVATION + EXPLANATION
There is a single bathroom at first-floor level with a bath, over-bath shower, basin and WC. The sealant around the bath is failing at the wall junction and mould growth is present to the grout above. There is no mechanical extract ventilation and the window was the only means of ventilation.
THE RECOMMENDATION
We recommend that the sealant is renewed and that an electrician installs a mechanical extract fan vented to outside, which would be required under current Building Regulations for a room of this type.
Read 6H in the PDF7AElectricity
OBSERVATION + EXPLANATION
The electricity meter and consumer unit are located in the cellar head cupboard. The consumer unit is an older rewireable fuse board with no residual current device. The visible wiring in the cellar includes runs in rubber-sheathed cable. No inspection certificate or test record was made available, and the unit carries no next-inspection label. An installation of this apparent age, without RCD protection and without any test record, cannot be assumed to be safe. Electrical Safety First recommends that you get a registered electrician to check the property and its electrical fittings at least every ten years, or on change of occupancy.
THE RECOMMENDATION
We recommend that a registered electrician carries out a full Electrical Installation Condition Report before you commit to the purchase, and that you obtain a quotation for any remedial work it identifies at the same time. A rewire should be anticipated as a possible outcome and budgeted for.
Read 7A in the PDF7DHeating
OBSERVATION + EXPLANATION
The property is heated by a gas-fired combination boiler located in a housing unit in the kitchen, serving radiators throughout. The boiler carried no service sticker and no service history was made available. Radiators were present in all habitable rooms. We did not test the system and cannot comment on its performance.
THE RECOMMENDATION
We recommend that a Gas Safe registered engineer services the boiler and confirms its condition and remaining life before occupation.
Read 7D in the PDF7FDrainage
OBSERVATION + EXPLANATION
Surface water and foul drainage appear to discharge to a shared connection at the rear. We lifted the accessible inspection chamber cover at the rear of the property; the chamber was free-flowing at the time of inspection, with no standing water and no evidence of surcharging. We did not test the drains and no below-ground inspection was carried out. A visual inspection of an open chamber shows the condition at that point on the day and nothing about the runs between chambers.
THE RECOMMENDATION
We recommend that a drainage contractor carries out a CCTV survey of the below-ground drainage before you commit to the purchase, particularly given the age of the property and the mature tree at the rear boundary.
Read 7F in the PDF8BPermanent outbuildings and other structures
OBSERVATION + EXPLANATION
There is a single-storey brick outbuilding at the rear of the yard, under a corrugated sheet roof. We inspected it internally. The brickwork is sound and the structure is serviceable. The roof covering is a corrugated sheet material of a profile and apparent age consistent with fibre cement. Fibre cement sheeting of this period may contain asbestos. We have not tested it. It is in sound condition and, undisturbed, presents no risk.
THE RECOMMENDATION
We recommend that you do not cut, drill or break this sheeting. If it is to be removed, a competent asbestos surveyor should sample it first and the result should govern the method of removal and disposal.
Read 8B in the PDFACTUAL LEVEL 3 / ANONYMISED WORKED EXAMPLE
A detail.
The wider building.
This summary comes from an issued Level 3 report. It is a different property from the fictional Level 2 specimen above, so it is not a controlled comparison of two surveys on the same house.
Inspect the original photograph and findingLEVEL 3 / 5D MAIN WALLS / ORIGINAL ELEMENT RATING 3
The air brick was only part of the finding.
- Visible observation
- External ground partly covered the air-brick openings. The report identified a rear ventilator as half covered where the level had been raised against the wall.
- Read with the building
- The report identified restricted ventilation to the suspended floor void. It considered this alongside eroded pointing, cracking and moisture concerns elsewhere in the building.
- Concealed condition
- The photograph does not show the floor void or establish the condition of concealed joists. The report recorded that the ground-floor structure could not be inspected directly.
- Recommended action
- The external level was to be lowered clear of the air brick, with the wall repairs and a wider investigation scoped around the recorded moisture and structural questions.
Read the original rating in context
This was one finding within a main-walls element rated 3. That element also included extensive pointing deterioration and cracking; the rating was not solely a judgement on this air brick.
Source checked: issued Level 3 report, main walls, pages 23–24; ground-floor limitation, pages 35–36; photograph 18. Anonymised summary, not a complete report or a new diagnosis. Reviewed 21 October 2026.
What to ask of your own Level 3 report.
Look for an explanation of construction, significant defects, likely causes where reasonably assessable, implications and repair or investigation options. A more detailed report still has access limits. Ask the practice to define its service and explain any significant unknowns; this one example does not prescribe identical findings or wording for every house.
Understand the Level 3 scopeSCOPE / THE SAME LIMITS AS A REAL REPORT
What this sample does not do.
The inspection behind a report like this is visual and non-invasive. No floorboards are lifted, no furniture is moved and no part of the structure is opened up. Services are observed rather than tested, so the electrical and heating entries above recommend specialists rather than certify anything. There is no valuation. Anything the surveyor could not reach on the day is recorded as a limitation rather than left out. The full element checklist
THE PART A PDF CANNOT DO
Then the person
who saw it calls.
Ask what matters, what can wait, what to raise with the solicitor and where the price you agreed may need another conversation.
See my fixed price