EXAMPLE / 07 RAINWATER PIPES AND GUTTERS
Debris and vegetation in a gutter
The report recommended clearing the gutters, checking leaks and falls, and repairing the garage drainage details.
Enlarge photograph Debris, moss and vegetation in the side gutter.
ANONYMISED REPORT SUMMARY
Level 2 / 5c · Rainwater pipes and gutters
- 01What was observed
- The report recorded debris, mortar, moss and vegetation in the gutters. It also recorded a missing stop end and a garage downpipe discharging directly into the ground.
- 02What the report concluded
- The visible obstruction and incomplete rainwater details were defects requiring attention. The report explained the risk of water discharging onto adjacent walls and ground.
- 03What remained uncertain
- Leaks and gutter falls still needed to be checked after clearance.
- 04What was recommended
- A roofing contractor was to clear the gutters, check leaks and falls, fit the missing stop end and connect the garage downpipe to a gully or drainage system, alongside the roof repairs.