An obstructed air brick beside a timber floor

What an issued Level 3 report in Stockport recorded, with the inspection photograph and the original advice.

EXAMPLE / 11 SUBFLOOR VENTILATION

Partly covered air brick

The report recommended lowering the external ground level clear of the air brick.

A low-level air brick with part of its opening covered by the adjoining external ground.Enlarge photograph
THE ORIGINAL PHOTOGRAPH

An air brick partly covered by the raised external ground level.

ANONYMISED REPORT SUMMARY
Level 3 / 5d · Main walls

3
01What was observed
External ground partly covered the air-brick openings. The report identified a rear ventilator as half covered where the level had been raised against the wall.
02What the report concluded
The report identified restricted ventilation to the suspended floor void. It considered this alongside eroded pointing, cracking and moisture concerns elsewhere in the building.
03What remained uncertain
The ground-floor structure could not be inspected directly, so the condition of the concealed joists remained unknown.
04What was recommended
The external level was to be lowered clear of the air brick, with the wall repairs and a wider investigation scoped around the recorded moisture and structural questions.
Why this element was rated 3

Main walls were rated 3. The element also included extensive pointing deterioration and cracking.

Checked against the issued Level 3 report from Stockport: 5d · Main walls; pages 23–24, 35–36; photograph 18. Reviewed 22 November 2026. Wording is an anonymised summary, rather than a reproduction of the report.

Questions for a follow-up call

  • Where does this opening lead, and can the floor void and bearings be inspected?
  • Which other wall findings were included in the same condition rating?

Use the findings and timeframes in your own report when discussing a different home.

Organise the answers in your report action planner