- 01What was observed
- The roof slab's underside was spalling and crumbling, with exposed, corroded reinforcement. The report also recorded deteriorated canopy supports and moisture-damaged finishes.
- 02What the report concluded
- The report described the roof as unreliable in its recorded condition, with a risk of further concrete breaking away. It recommended assessment before exchange.
- 03What remained uncertain
- Further assessment was required to decide whether to replace the roof or remove the outbuilding.
- 04What was recommended
- A structural engineer or suitably experienced contractor was to inspect before exchange, with replacement of the roof or removal of the structure considered. The canopy supports were to be addressed at the same time.