EXAMPLE / 08 MAIN WALLS
Cracking at a bay-window corner
The report recommended repair-history enquiries, drain surveys and monitoring of the cracks.
Enlarge photograph Cracking at the right-hand corner of a bay window.
ANONYMISED REPORT SUMMARY
Level 2 / 5d · Main walls
- 01What was observed
- Cracking, eroded mortar and evidence of earlier repair were recorded at a bay corner. The blue brick course and wall above appeared slightly proud of the masonry below.
- 02What the report concluded
- The report described the cracking as generally minor but could not establish the cause of the movement from the visual inspection.
- 03What remained uncertain
- The projection of the brickwork was estimated. Repair-history enquiries, drain surveys and crack monitoring were still needed.
- 04What was recommended
- The buyer was advised to obtain the repair history, commission drain surveys and monitor the cracks. An engineer's inspection was recommended if drainage defects were found, movement continued or the seller could not explain the repairs.
Checked against the issued Level 2 report from Coventry: 5d · Main walls; pages 11, 21–22; photograph 9. Reviewed 22 November 2026. Wording is an anonymised summary, rather than a reproduction of the report.