View larger illustration A later semi with a flat-roofed addition
How were the roof and original external wall altered?
Your Level 3 decisionDiscuss Level 3 where substantial alterations or recurring defects need a more detailed assessment. The survey is not a guarantee against future leaks or concealed construction defects.
Viewing checks and records
- AT THE VIEWING
- For a rear addition, ask about roof renewal, drainage and the opening into the house. Compare ceiling and floor levels with the plans. A dry viewing on one day does not prove that the roof or concealed junctions are trouble-free.
- RECORDS TO REQUEST
- Request extension drawings, relevant structural and completion evidence, and roof specifications or guarantees. Ask about past leaks and repairs; the inspection cannot establish every hidden layer from the finished surfaces.




